EICR Remedial Tracking: A Process for Service Businesses

November 18, 2026
EICR Remedial Tracking: A Process for Service Businesses

EICR remedial tracking means turning every coded observation in an electrical report into its own action, with an owner, a deadline and close-out evidence, and keeping it open until the work is verified. The report itself is a record of condition. The tracking is what shows, months later, that each finding was dealt with. Doing this in one connected system, where the report, the job, the asset and the certificate sit together, removes the spreadsheet chasing that makes remedials slip.

Curcle
curcle.co.uk
Keep EICR remedials in view
Curcle brings jobs, assets, compliance and operational reporting together, helping service teams track work with information in one connected system.
Visit

TL;DR

  • Register each C1, C2 and FI observation as a separate action, never one broad "EICR remedials" task.
  • Triage on the day the report arrives: confirm C1 items are made safe, and name an owner for every C2 and FI.
  • Follow the timescale on the report. In England's private rented sector, remedial work is due within 28 days or any shorter period the report specifies.
  • Close an item only with evidence that ties the completed work to the original observation number.
  • A job-linked platform such as Curcle keeps findings, jobs, assets and certificates in one record, so nothing sits in an inbox.

Table of Contents

What EICR remedial tracking involves

An Electrical Installation Condition Report (EICR) assesses an existing fixed electrical installation. NICEIC's guidance describes it as a report, not a certificate, assessed against the edition of BS 7671 (the UK wiring standard) current at inspection. Each safety observation carries a code.

GOV.UK guidance defines them:

CodeMeaningEffect on the report
C1Danger present, risk of injuryUnsatisfactory
C2Potentially dangerousUnsatisfactory
C3Improvement recommendedDoes not make it unsatisfactory
FIFurther investigation requiredRead against the report's stated action

For a deeper look at the codes, see our EICR coding guide.

Tracking starts where the electrician's job ends. Someone must read the report, decide what happens to each code and prove the outcome. For a landlord, housing provider or facilities team with dozens or hundreds of properties, that is a register of open items, not a filing cabinet.

Triage on the day the report arrives

Filing comes after triage. SDM Electrical's guidance recommends a same-day check on receipt:

  1. Confirm whether the result is Satisfactory or Unsatisfactory.
  2. Read every C1, C2 and FI entry with its location and observation number.
  3. Verify each C1 circuit is isolated or made safe.
  4. Record who owns the next action for every C2 and FI item.
  5. Keep the report open in the defect register until suitable certification closes the coded observations.

The C1 rule matters most. NICEIC's guide says that for a C1 the person ordering the report should be advised to act without delay or isolate the affected parts, and the inspector should not wait for the full report to give that advice. Your tracker should therefore record what was done on site, by whom and when.

What to record for each finding

A useful record answers who, what, where and by when. True Compliance's 2026 guide lists the following for each actionable finding:

  • the classification and the exact observation wording;
  • the location and the affected circuit or asset;
  • the statutory or report deadline;
  • the person responsible for arranging the work;
  • any immediate action taken to control danger;
  • appointment, access and contractor updates;
  • the completion document;
  • independent or competent verification where required;
  • the date the resident received the completion evidence.

At report level, add the inspection date, the next-inspection date taken from the report (not auto-calculated as five years), the qualified person and the contractor.

Give contractors the EICR wording and the circuit references, so the quotation addresses the coded issue rather than a general "fix the board". SDM Electrical also advises deciding at order stage whether completion needs a Minor Electrical Installation Works Certificate (MEIWC) or an Electrical Installation Certificate (EIC).

Prioritising C1, C2, C3 and FI

Three buckets keep a large backlog manageable. Azure Electrical's remedial plan suggests:

  • Make safe now: typically C1. Isolate circuits, remove damaged accessories, lock off access.
  • Book urgent remedials: usually C2, and sometimes FI.
  • Planned improvements: the C3 list.

FI deserves its own attention. The same source notes it is one of the most common reasons a report stays open for months. Book a short investigation visit with a clear outcome note that either clears the item or converts it into a remedial action. Initial Electrical adds that FI items can reveal hidden faults and should not be assumed low priority, while C3 items are best reviewed alongside refits or board upgrades.

Check which edition the report follows

BS 7671:2018+A4:2026 was published on 15 April 2026 and took full effect on 15 October 2026, after the previous version was withdrawn. Rudi Electrics points out that FI is treated differently across editions and forms: Amendment 4 treats it as advisory, while earlier forms used it for investigation required without delay. Follow the stated action and timescale on the report in front of you, and record the edition in your tracker.

Deadlines by nation

There is no single UK-wide landlord EICR law. RCD Electrician's 2026 guide notes that each nation has its own regime, with a five-year interval common to all four.

England. Under the GOV.UK guidance, landlords must have the installation inspected at least every five years. They must supply the report to existing tenants within 28 days of the inspection, to new tenants before occupation, to prospective tenants within 28 days of a request and to the local council within 7 days of a request. The Electrical Safety Roundtable states the remedial clock for private landlords runs from the date of inspection and testing, not receipt of the report. Written confirmation of completed work goes to each tenant and the local housing authority within 28 days of completion. The rules were extended to social rented housing: for tenancies granted after 1 December 2025, and from 1 May 2026 for earlier ones, per the same GOV.UK guidance.

Wales. Electrical condition reports are required at least every five years under the Renting Homes (Wales) framework, with obligations broadly mirroring England's.

Scotland. Landlords have needed EICR and PAT checks since 1 December 2015, and from 1 March 2024 the main consumer unit must have at least one 30 mA RCD.

Northern Ireland. The regulations became operational on 1 April 2025 for new tenancies and 1 December 2025 for existing ones, per the Electrical Safety Roundtable. For an unsatisfactory report, Belvoir's guide says written confirmation goes to the tenant and a copy to the council within 28 days of completion.

Because each report has its own due dates, your tracker should hold a deadline per finding, not one date per property. See our guide to EICR inspection intervals for planning the five-year cycle.

Deadlines by nation

Evidence that closes an item

An Unsatisfactory report stays that way until each C1, C2 and FI observation has matching close-out evidence. SDM Electrical also notes that if an incident happens while items remain open, the report can show the duty holder knew about the hazard beforehand. That is why close-out evidence matters.

Keep, for every item:

  • the completion certificate or minor works certificate, reconciled to the original observation number;
  • invoices, updated schedules and before and after photos;
  • the confirmation of which observations were addressed;
  • proof of delivery: the date and method the report and completion evidence reached the tenant, the council or the next inspector;
  • access attempts, failed visits and escalation decisions, which support a reasonable-steps defence.

The delivery-evidence list follows True Compliance's summary of the handover duties. NAPIT's guidance for members also points to the Landlord Electrical Installation Safety Record, used alongside the EIC or MEIWC, as a clear record landlords can distribute.

One caution from Rudi Electrics: a code does not replace competent judgement, and the handover should connect the completed work to the original observation. The fix might be repair, replacement, disconnection, more testing or a wider circuit alteration, so the close-out note should say which.

Why spreadsheets fall short

A spreadsheet can list findings. It cannot create the job, send the engineer, hold the photo from site, update the asset record and raise the invoice. Each of those steps then becomes a manual copy, and each copy is where an item gets lost. The failure points are predictable:

  • findings re-typed from PDFs, with the circuit reference dropped;
  • a C2 with no named owner;
  • an FI left open because nobody booked the visit;
  • completion paperwork filed by property, not by observation;
  • no single view of what is overdue across all sites.

Our audit-ready reporting guide covers how to make the output of this process easy to present when an auditor or client asks.

How Curcle handles remedial tracking

Curcle brings jobs, customers, engineers, assets, compliance, invoicing and reporting into one connected system. For EICR work that means findings can sit against the asset and site register, remedial jobs can be scheduled and dispatched to engineers on the mobile app (which works offline), photos and documents are captured on the job, and audit trails and role-based dashboards give managers a view of what needs attention. See EICR software for electrical contractors and the wider compliance features.

We built Curcle inside a real UK service and engineering business, and the lesson from that is simple: a remedial item that lives in an inbox will be forgotten, and one that lives as a job against an asset will not. Compliance should be part of the backbone of the system, not a spreadsheet bolted on the side.

Our view is that software should tell you what needs attention, not just record what already happened. For EICR work, that means every C1, C2 and FI is a visible item with an owner and a deadline, and close-out evidence that ties back to the original observation. AI should assist your judgement, never replace it, and every click should earn its place.

Luke Herridge

Setting it up in practice

  1. Import the report. Create one record per coded observation, with wording, location and circuit.
  2. Assign severity buckets. Make safe now, urgent, investigate, planned.
  3. Name an owner and a date for each item, using the report's timescale or the legal deadline, whichever is earlier.
  4. Raise a job per item or per logical group of items, passing the observation wording to the contractor.
  5. Capture completion evidence on the job: certificate, photos, notes.
  6. Verify that the certificate clears the original observation, then close it.
  7. Deliver and log the confirmation to tenants, council or client, with date and method.
  8. Review weekly: overdue items, open FIs and upcoming five-year dates.

If you are comparing plans, Curcle's pricing page lists Starter from £99 per month, Professional from £249 per month and Business from £499 per month, with Enterprise on request. Facilities teams running multiple sites can see the facilities page.

Curcle

FAQ

What is the difference between an EICR and a remedial certificate?

The EICR reports the condition of the installation and codes each observation. A remedial certificate, such as an EIC or minor works certificate, records the work that corrects those observations. Your tracker should link the two by observation number.

How long do I have to complete remedial work after an unsatisfactory EICR in England?

In the private rented sector, the work is due within 28 days of the inspection, or sooner if the report states a shorter period. Written confirmation then goes to the tenant and local housing authority within 28 days of completion, per the Electrical Safety Roundtable guidance above.

Do C3 items need tracking?

C3 items do not make a report unsatisfactory, but logging them as planned improvements means they can be scheduled with refits or board upgrades rather than rediscovered at the next inspection.

How long should I keep the EICR?

GOV.UK guidance says landlords must retain the report until the next inspection is required or conducted, unless it is superseded. Keep the remedial evidence with it.